Supportive engineering services for an LPG import terminal with jetty piping in Berbera, Somaliland.

Project overview

Amanda Engineering provided supportive engineering services for a 2 x 2,500 MT LPG import terminal with jetty piping at Berbera, Somaliland.

The scope covered partial supportive engineering services for the LPG spheres and associated terminal facilities, with design and equipment aligned to ASME Section VIII Division 2.

Client
Private terminal developer
Location
Berbera, Somaliland
Scope
2 x 2,500 MT LPG terminal
Amanda role
Supportive engineering services: design review and technical coordination
Design code
ASME Sec VIII Div 2
Scope of services

What we delivered.

The assignment was delivered by Amanda Engineering and its associates, with the client and project partners.

  • Two LPG spheres of 2,500 MT each, with 5,000 m3 capacity per sphere.
  • Design pressure 13.5 bar at the top.
  • 36 mm shell thickness in SA 537 Class 2 material.
  • Sphere diameter 21.25 m and ship unloading rate of 450 MT/hr.
  • Jetty piping and associated terminal facilities.
  • Design review and construction support.
Project notes

LPG sphere engineering in Berbera

The engineering and delivery context behind the assignment.

The Berbera terminal covers two 2,500 MT LPG spheres with jetty piping. The design uses ASME Section VIII Division 2, 13.5 bar design pressure, 5,000 m3 capacity per sphere, 36 mm shell in SA 537 Class 2 and 21.25 m diameter.

Ship unloading is designed for 450 MT/hr. The scope included supportive engineering services for the spheres and associated terminal facilities.

The work required coordination between the marine, storage and civil works, with attention to foundation loads, piping routes, safety distances and construction access.

Our role covered design review and construction support, with documentation aligned to the project's technical requirements.

Sphere designCapacity, pressure and material requirements were reviewed.
Marine interfaceJetty piping and ship unloading requirements were coordinated.
Civil interfaceFoundations and access were considered with the storage layout.
Technical documentationDesign and construction records supported delivery.
Key challenges

What made the assignment demanding.

The terminal sits in a port environment where storage, marine and safety interfaces meet.

  • Coordinating storage and jetty piping interfaces within the port layout.
  • Reviewing sphere design and fabrication requirements against ASME Section VIII Division 2.
  • Supporting the client team through design review and construction queries.
Outcome

Project result.

The assignment supported the development of LPG import capacity at Berbera, with engineering inputs aligned to the project design and operating requirements.