Oil & Gas Engineering
LPG terminals and tanks, EPC for turnkey projects, gas and oil facilities, and specialist engineering support.
Amanda Engineering provides engineering support for oil and gas projects, including LPG import terminals, mounded bullets, storage spheres, jetty piping and associated facilities.
Our work covers EPC for turnkey projects, procurement, construction supervision, commissioning and compliance with applicable design codes such as ASME Section VIII Division 2.
- Service area
- Oil and gas engineering
- Focus
- LPG terminals and tanks
- Delivery
- EPC, procurement and supervision
- Related projects
- Mombasa / Berbera

Engineering for safe storage and handling.
We coordinate civil, structural, mechanical and process interfaces so that LPG storage, jetty piping and safety systems are designed, tested and commissioned as one facility.
- Senior-led delivery with a named technical lead.
- Documented assumptions, decisions and design basis.
- Interface management between design, procurement and construction.
What the service covers.
Scope can be tailored to the stage of the project and the client's in-house capacity.
- LPG mounded bullets, spheres and import terminals.
- Jetty piping, ship unloading systems and associated facilities.
- EPC services for turnkey oil and gas projects.
- Design review, procurement and construction supervision.
- Commissioning, testing and handover support.
- Compliance with ASME and applicable design codes.
Oil and gas projects demand disciplined engineering and clear safety cases.
Civil, mechanical, electrical and process teams must work to the same design basis and the same construction sequence.
We support LPG import terminals, mounded bullets, storage spheres, jetty piping and associated facilities. Our work covers engineering review, procurement support, construction supervision, testing and commissioning.
For the Mombasa LPG terminal, our supportive engineering services covered 15 mounded bullets of 1,650 MT each, a nominal total of 25,000 MT, and a separate 4 x 2,500 MT sphere terminal with jetty piping. The bullets were designed to ASME Section VIII Division 2, with a design pressure of 17.24 bar, 3,450 m3 capacity, 8.0 m diameter and approximately 68 m length.
For the Berbera terminal, the scope covered two 2,500 MT LPG spheres with 5,000 m3 capacity, a design pressure of 13.5 bar, 36 mm shell in SA 537 Class 2, 21.25 m diameter and a ship unloading rate of 450 MT/hr.
We coordinate civil and structural works, safety systems, testing and documentation so that the facility can be commissioned and operated safely. Our role is to keep the interfaces visible from design through to handover.
A practical sequence.
The sequence is adapted to the stage of the project and the client's in-house capacity.
Concept and design review
Review the design basis, codes, layout and interfaces.
Procurement and fabrication
Support specifications, vendor review and factory testing.
Construction and installation
Coordinate civil, structural, piping and equipment works.
Testing and commissioning
Support testing, documentation and handover.
See the work in context.
Examples of projects where this service has been applied.
What you receive.
The exact deliverables are agreed in the scope of work. A typical assignment includes the following.