25,000 MT LPG Import Terminal, Mombasa

Supportive engineering services for a 25,000 MT LPG storage facility made up of 15 mounded bullets, and a separate 4 x 2,500 MT sphere terminal with jetty piping.

Project overview

Amanda Engineering provided supportive engineering services for LPG terminal development at Mombasa. The assignment covered 15 mounded bullets with a combined nominal capacity of 25,000 MT (1,650 MT each, 24,750 MT exact) and a separate 4 x 2,500 MT sphere terminal with jetty piping.

The scope covered partial supportive engineering services, design review and construction support for the mounded bullets and spheres, with equipment and systems designed to ASME Section VIII Division 2.

Client
Private terminal developer
Location
Mombasa, Kenya
Scope
25,000 MT LPG import terminal
Amanda role
Supportive engineering services: design review, construction support and technical coordination
Design code
ASME Sec VIII Div 2
Scope of services

What we delivered.

The assignment was delivered by Amanda Engineering and its associates, with the client and project partners.

  • Supportive engineering services for 15 mounded LPG bullets of 1,650 MT each, a combined nominal capacity of 25,000 MT (24,750 MT exact).
  • Each bullet: 3,450 m3 capacity, 8.0 m diameter and approximately 68 m length.
  • Design pressure 17.24 bar at the top with 38 mm shell thickness.
  • Support for a 4 x 2,500 MT LPG import terminal with jetty piping.
  • Spheres of 5,000 m3 each, 21.25 m diameter, 44 mm shell and 450 MT/hr ship unloading rate.
  • Design review, construction support and technical coordination.
Project notes

Engineering support for a 25,000 MT LPG terminal

The engineering and delivery context behind the assignment.

The Mombasa LPG import terminal is a large storage and handling facility. Amanda Engineering provided supportive engineering services for the mounded bullets, spheres and jetty piping.

The 25,000 MT facility comprises 15 mounded bullets of 1,650 MT each. Each bullet has 3,450 m3 capacity, 8.0 m diameter and approximately 68 m length, with a design pressure of 17.24 bar and 38 mm shell to ASME Section VIII Division 2.

The associated 4 x 2,500 MT terminal includes 5,000 m3 spheres, 21.25 m diameter, 44 mm shell and a ship unloading rate of 450 MT/hr, with jetty piping connecting the marine facility to storage.

Our role included design review, construction support and technical coordination across civil, structural, mechanical and process interfaces.

Mounded bulletsBullet geometry, capacity and design pressure were reviewed against the design code.
Spheres and jetty pipingStorage and marine interfaces were coordinated with the terminal layout.
ASME complianceDesign and fabrication requirements followed ASME Section VIII Division 2.
Construction supportTechnical queries and interface issues were resolved during delivery.
Key challenges

What made the assignment demanding.

The terminal combines two different storage configurations and a marine interface.

  • Coordinating mounded bullets and spheres with jetty piping in one terminal layout.
  • Reviewing designs against ASME Section VIII Division 2 across civil, structural, mechanical and process interfaces.
  • Supporting construction queries without disrupting the terminal delivery programme.
Outcome

Project result.

The assignment supported the delivery of large-scale LPG import and storage capacity at Mombasa, with engineering inputs aligned to the project design codes and operating requirements.

Translate page Kiswahili Français العربية 中文 English Powered by Google Translate